settings
MEMBER LOGIN
settings
SIGN UP
Which Training is right for you?

3D Machine Control Training (Topcon) from the seat.

Training from the seat with us...

LEARN TO:

Dig/grade/Doze to 3D lines

  • Use the machine to dig or grade or doze to any 3D design line.

Excavate sewer/stormwater lines on grade

Prepare pavement for kerb on flat or graded base.

Cut out Footpath heights during Earthworks.


Dig/Grade/Doze to surfaces

Dig / Grade / Doze roads to any level relative to finished height.

eg Subgrade height, sub-base rock layers, finished layers, topsoil heights.

Use surface to excavate to certain depth to ensure cover requirements (and clearances to other assets) are met.  

(Eg Minimum cover for watermain may be 600mm below finished level.  Under the 100mm there is a requirement for 100mm sand.  Easily set dig height to finished level -800mm (or 850mm to allow a little bit of extra).

From the cab learn to:

Create your own 3D line to dig/grade to

Create your own surface to bulk-dig to eg V-drain in a paddock draining between 2 points or at specific grade.

Create your own surface on site - sloping (1 or 2 directions), flat or from multiple points. 

GPS File Preparation (Topcon for site or Machine Control)

Training from the seat with us:

LEARN TO:

Prepare Topcon Files for

  • Site Setout controller - Pocket 3D
  • Machine File - 3DMC (3D Machine Control)

preparing files ready to go into Machine File OR into Controller for Site Setout.

Organise:

Layers

Control

Linework (string together)

Heights on lines (so machines can dig to sewer/stormwater levels)

Neaten files

Ready to go into either site controller for stakeout, or directly into Machine.

We will also explain how best to manage your data.

Watch as we prepare jobs from start to finish ready to go to work...

GPS Site Setout

Watch as we show you how to set-out all construction items from the screen on site.

LEARN TO:

Transfering Files into controller

Ensuring equipment is setup correctly

Localise the job.

Setout:

Earthworks

Sewer

Stormwater

Title

Stakeout lines

Setout utilities (lines and pit heights)

Set out footpath (location and height)

Setting out for kerb

Setout points

Record points.

Save from Controller back to PC.

About Stegg Civil

Technology is constantly changing. Let us show you how to keep your employees up to date and how they can access instructional videos on demand anywhere they have Internet access.

Our Members get access to an extensive library of instructional videos like the one below

[bot_catcher]